Your SAP authorisation does not move with you

A SAP authorisation belongs to one network's safety rules. Change network and you are assessed again. Here is what to plan for.

HIGH VOLTAGE · 4 NOV 2026 · 1 MIN READ

A Senior Authorised Person authorisation is issued by one asset owner, under its own safety rules, for named voltages and equipment. Change network and the process starts again.

National Grid’s own appointment instruction says SAP and AP authorisations are withdrawn when someone leaves and do not transfer. Other networks run their own schemes.

What will a new network ask for?

Allow for a safety rules course and an authorisation interview before you take charge of switching. Some roles build that into the first weeks of the contract. Others want it done before day 1. The advert should tell you which.

Why does every advert need a voltage?

Authorisations are voltage-specific. A 33kV SAP is not a 132kV SAP, and you should not have to ring up to find out which one a site needs.

Is AP work the route to SAP?

Usually. On National Grid’s rules, a SAP candidate is nominated, mentored, trained and interviewed, and AP experience on live sites is what that nomination rests on. National Grid also allows non-company staff to be authorised as APs, renewed each year.

Every HV role we post names the network and the voltage. The SAP and AP guide covers the rest.

Read next.

All insights
Engineer at a control room desk with network diagrams on screen

Tell us about your experience. We’ll tell you where it’s needed.

Upload your CV, tickets and clearance once. When a live role matches, we call you.